Showing posts with label Sponsors. Show all posts
Showing posts with label Sponsors. Show all posts

Tuesday, October 11, 2011

New Catalina Retrofit Windows!

Nirvana has had another facelift!  This time her old and leaky ports were removed and replaced with new "retrofit windows" from our sponsor, Cruising Concepts.  Here's a how-to, but if you don't want to read all of this ... the pictures pretty much tell the story.

The kit that we received from Cruising Concepts consisted of eight beveled Lexan ports, eight almond-colored interior trims, the screws (which we did not use) for the interior trims, and 3 tubes of Dow Corning 795 black silicone sealant. 

With the help of a friend, Ken spent the first day removing the old ports, cleaning the "holes", and installing the new ports with the black silicone sealant that came with the retrofit kit.  I was there to lend a hand when I could, but I mainly took pictures, handed the guys a tool every now and then, and cleaned up behind them to make myself feel useful.

The old ports came out easily with a crowbar and a hammer, and we hope to sell them soon ... any buyers? 

The "holes" were then scraped free of debris and cleaned with acetone. 






Then, the new port was positioned and marked with a pencil.  The space between the "hole" and the pencil mark was filled in with a layer of the black silicone sealant, then another bead of the sealant was run in the middle of the black layer.



The port was then carefully positioned and pressed onto the sealant.  At this time, Ken taped the corners of the ports to keep them from popping up.  Some of the corners needed even more than tape, so Ken wedged a piece of wood between the port and the lifeline to keep pressure on the port overnight.



The interior of our sailboat already looks fresher and more open without those ugly aluminum frames!  Ken and Rolando repeated this another three times on portside, then it was time to turn Nirvana around to access the starboard side.  Since our new ports needed time to "set", we didn't want any vibration and didn't want to start the engine.  So, we turned Nirvana around without the use of the engine ... just our dock lines.  After the same process was complete on the starboard side, Ken and Rolando called it a day.  Wouldn't you know that as the last port was being installed it began to rain.  Where did that come from?!  It wasn't supposed to rain!  Luckily it didn't last very long and I immediately dabbed the edge of the ports with a towel and dried the deck.  No harm seemed to be done, but it did put a "damper" to the end of our day.  We really didn't want to think of having to do everything all over again!  Luckily, we had great weather for the remainder of our project.



On the second day Ken noticed that a couple of the corners of the new ports were not completely stuck to the boat.  So, he added a little more sealant to those areas and wedged a piece of wood between the lifelines and the port, as he had previously done to some of the corners that were stuck to the boat.   On the rest of the ports on the starboard side, Ken used a razor blade to cut away the excess sealant that was now dry.  He then ran a bead of the black sealant around the edge of the port.  Since we had other work to do that day, we stopped at this point.  This process took about an hour.

The third day started with cleaning around the ports on the starboard side.  We were a little concerned about how easy (or difficult) it would be to clean the black smudges that remained from the sealant.  At first we tried rubbing alcohol, then we tried acetone.  The acetone removed the dark black smudges away pretty easily, but a gray stain remained behind.  So, we cleaned around the ports with the acetone, then used 180 grit sandpaper to lightly sand away the gray stain.  This worked really well, with very little pressure.

Now it was time to turn the boat around again without turning on the engine.  Ken needed to repeat the same process on the starboard side, cutting away the excess sealant and running a bead of the black sealant around the edge of the ports.  After he ran the bead of black sealant, Ken then installed the interior trims to  portside, which was already dry from the previous day.  The interior trim came with screws, but we really didn't want to use the screws if we didn't have to.  The trim looked so sleek and nice, we didn't want to see screws!  So, we bought some almond-colored adhesive sealant to install the interior trim.  So far, this seems to work and we're really glad we didn't use the screws.  After a couple of hours we were done for the day so the black sealant could dry around the starboard ports.

Interior trim applied then taped till dry

On the fourth day we cleaned the starboard ports with the acetone, then lightly sanded away the black smudges.  Ken then added the interior trims to the starboard side, and we were now finally ready to remove the brown paper from the exterior of the ports and see the results of our work!  The whole project took a full day with two men (and my help), and about another five hours off and on with mainly just Ken.

Ain't she sweet?!

I must admit that Ken was really concerned when we first received the ports, because he feared that the ports wouldn't fully adhere to the boat and that they would leak.  He was also concerned that the Lexan ports would look like cheap plastic just stuck on our boat.  However, I am pleased to say that we are both really happy with the results and would definitely recommend these ports.  The Lexan ports are thick and beveled, and they look great on Nirvana!  They only concern we still have is that Lexan scratches so easily.  We've already broken in the ports with our first scratch, and this boat will be used a lot so ... we shall see.  

The ports seem to have adhered really well (with the help of some added pressure) and we don't think that we'll have any leaks.  Ken looked up information about the black sealant that came with the kit, and it is used to adhere windows to skyscrapers.  This bit of info made us feel better.  If this stuff can be trusted to hold up a window on a skyscraper than it oughtta be able to hold our little ports.  Time (and rain) will tell!

Here are a few "before and after" shots, which really show the improvement the new ports make.  Nirvana can't wait to get out on the water with her new, younger look!








Of course, this project has drawn attention to our ugly and leaky hatches!  We're not buying new hatches, but now we're working on restoring the ones we've got.  (Notice the taped over hole where the hatch should be up front)?  Update:  Click here for post about restoring our old hatches.

Cruising Concepts offers a lot of great products for boats, and Mike provides great customer service.  He's easily accessible and was happy to speak with me whenever we had a question.  Check out his site!

Hasta luego ... until then.  Mid-Life Cruising!

Monday, July 25, 2011

We Have A Sponsor!

Cruising Concepts Retrofit Windows
The past two weekends have been really rainy, so Ken and I haven't done any sailing lately.  The rain seemed to be a valid excuse to stay indoors, but after looking out back yesterday and seeing our neighbors across the canal barbecuing in the storm ... I guess we're just lame!  The rain was really coming down and not only were our neighbors barbecuing, but they had several friends over and they were all in the hot tub ... in the rain with no cover.  At least somebody was having fun!

We may not have had much fun in the sun lately, but the rain didn't stop us from working on something we're really excited about ... obtaining a new sponsor!  Yes, we have a new sponsor ... Cruising Concepts! Check out their site and tell Mike we sent ya.

Cruising Concepts provides quality custom accessories for sailboats such as retrofit windows and hatches, custom companionway doors, interior doors, cockpit tables, and so much more.  Cruising Concepts is owned by a great guy named Mike, and thanks to his generosity we are getting the retrofit windows (pictured above) for our Catalina.  We are really excited about their arrival, and so thankful that Mike has decided to work with us.  Nirvana has suffered from leaky ports, so not only will these windows stop the leaks but they'll give Nirvana yet another updated look.  Currently Nirvana has aluminum ports, which give away her age on both the exterior and interior.  The new ports will eliminate the aluminum frame on the outside and replace the aluminum frame inside with a white frame, blending into Nirvana's interior.  In our opinion, the older ports are the last real "giveaway" of Nirvana's age (1987) and she'll be looking even younger soon! 

We've also added a new page to our site, Sponsors.  This page is a work in progress and it will consist of those businesses that have helped us reach our dream by providing us with discounts, free products, cash, etc.  We plan on adding more great products and services to this page.  If you have a product or service that you'd like us to try and share on our site, please click the "Email Us" link on the right of this site and email us. 

We'll keep you posted on the installation of these windows, as well as the finished product.

Hasta luego ... until then.  Mid-Life Cruising!

Related Posts Plugin for WordPress, Blogger...